Address: H.NO.2-14, Near Sai Baba Temple,Ederapalli, Amalapuram, Pin 533201,Andhra Pradesh
Since Feb’10 to Sep 2014 as Site Engineer(S&T) in VNR Infrastructures LTD.,
Project Planning & Management...
Andhra Pradesh
here by, declare that all the statements made in the above are true and correct to the best of ...
of 3


Published on: Mar 3, 2016

Transcripts - Nagendra(2)

  • 1. NAGENDRA MORAM Address: H.NO.2-14, Near Sai Baba Temple,Ederapalli, Amalapuram, Pin 533201,Andhra Pradesh Mobile:+918465870018, +919492669415,+918465870018, Erection & Commissioning/Testing Professional Snapshot ACADEMIA 2009 B.Tech.(ECE) from BVCITS, Ammalapuram, JNTU Kakinada, with 60.00% 2005 12thfrom Aditya Junior College, Board of Intermediate Ammalapuram, with 69.2% 2003 10th from Sir C V Raman Public School, Ammalapuram, Board of Secondary School Education with 69% IT SKILLS  Well versed with Windows, MS- Office, Windows XP, C Language and Internet Applications. TRAININGS UNDERGONE  Underwent training on Metro : Got Training at South Korea on Seoul Metro and have knowledge about ATS, ATC, AFC, Rolling stock and PSD ORGANIZATION SCAN Since Sep’14 to Till date as Testing Engineer(Signaling) in E2E Rail Pvt Ltd.,  Having knowledge in PI (Panel interlocking),SSI ( Solid State Interlocking) & CBTC (Communication based train control).  Having Expertise in Installation, troubles shooting ,Testing & Commissioning of Switches like IRS Point machine(CG) & MCEM91T (vossloh-cogifer) Three Phase Point Machine.  Having Good working experience in Train Detection systems Axle Counters.  Having experience in Installation, Trouble shooting, Integration, Testing and commissioning of ZP30H and ZP30K axle counters.  Having knowledge of doing PICO (Post Installation Check Out) for Wayside (Signals, Point Machines, Axle counters, Junction boxes , Point Machine Distribution Box, Transponder Tags , Proximity plates & Platform PESB)and Indoor cubicles ( Relay Racks, CTF racks, ACE rack, FEC rack, IM rack & PDC).  Carry out T&C activities as per test procedures and document as per the safety case, ISA and the contract requirements  To ensure that T&C adhere to the test cases & standards set by Thales  Preparing test plan, test cases & reports related to T&C A result oriented professional with an experience of over 5 years in Mainline & Metro signaling Projects.And having significant exposure in Project management, testing and commissioning of signaling projects. Previously associated with VNR Infra Structures Ltd., as a Site Engineer(S&T).Abilities in planning, executing projects involving Site Administration and Resource Planning.Conversant at overseeing erection & commissioning of various machines and equipment’s in reducing downtime and enhancing operational effectiveness of equipment. Exposure in planning & execution of projects for plant set up, modernization and installation / commissioning of equipment.Effective communicator & team leader with strong analytical, problem solving & organizational abilities.Experience in Core Plan based Cable Laying and Circuit Diagram based Testing in Relay Rooms, Outdoor & Indoor waysides. Experience in preparing outdoor particulars according to cable core plan and Bonding plan as per the site .
  • 2. Since Feb’10 to Sep 2014 as Site Engineer(S&T) in VNR Infrastructures LTD., Responsibilities Project Planning & Management  Managing activities right from the conceptualization stage to the execution; involving finalization of technical specifications, procurement, construction scheduling.  Establishing project review, monitoring and status reporting procedures to accurately report progress of the project to the stakeholders and end user clients.  Evaluating the quality requirements and ensuring the adherence to the same. Erection & Commissioning / Site Management  Handling the installation and commissioning of the heavy equipment as well as conducting tests & inspections to ensure operational effectiveness of utilities.  Handling the Home Signals, Shunt Signals, Starters, Point Machines and Signalling in RE Area installations.  Looking after the erecting of all Signal Aspects way side and Relay in Location box ’s as well as in Relay Room done with dept. people Wire –Wire Bell Testing.  Handling the Erection & commissioning of the equipment’s related to generators, power transformers & switchyard related equipment’s. Process Enhancement  Identifying scope for Planning, implementing & monitoring of technological changes to enhance productivity.  Modifications in equipment’s, process flow, working practices, consumables, power, etc. for controlling & reducing conversion cost per unit produced.  Implementing various techniques for cycle time reduction, entailing identification of opportunities, energy audits, analysis of data, conduction of tests, cost benefit analysis, implementation & post audits. Highlights  Supervised and executed the overall working of the signaling and telecommunication works of the 12 station buildings, marked for the Signal’s and Location Box’s foundation.  Accomplished the Site Level based on Engineering &Signalling Plans and also Co-Ordination with Client, Dept. Staff as a Team Lead.  Handled the installation of IPS (Integrated Power Supply) and giving connection to relay room, simulation testing if any errors occurred during Testing Modified done with Wireman.  Understanding of Project Schedule Quantities, BRS Documents and confirming Designs with Railway SSE (CSI) while developing Project.  Involved in Implementation and Execution of the Projects towards Commissioning by within Time Dead Lines by utilization of Availability of Resources given by the Project Manager.  Preparation of Technical Note, Presentations, Daily Work Monitoring Reports, Client Inter action Status Reports and Bill Variations with respect to Schedule Quantity.  Checking Location Particulars’ with respect to Cables Wayside (outdoor) signaling circuits and also Inside (Relay Room, Panel) signaling circuits. PROJECTS HANDLED With Rail Vikas Nigam Ltd., (A Government of India Enterprise) Project Title: Guntakal – Raichur Patch Doubling Work Client:Rail Vikas Nigam Limited Cost of the Project :221.93 Cr ( Supply and Installation of Signaling and Telecommunication works ) Location: Adoni. Description:When the Signals are operated from the Centralized location (Master’s Panel) it is governed by certain sequences of Operation. The sequentionaloperation of the signal with motorized point Machines aregoverned by “principles of Interlocking”. PERSONAL INFORMATION Name : Nagendra M Date of birth : 20/06/1988 Marital status : Single Father’s name : S.S.Vara Prasad Nationality : INDIAN Languages known : English,Telugu& Hindi (can Understand) Present Status : Site Engineer in VNR Passport Details : No: H3597000, Date of Expiry :26.04.2019 Permanent Address :H.NO.2-14 Near Sai Baba Temple Ederapalli Amalapuram 533201
  • 3. Andhra Pradesh DECLARATION here by, declare that all the statements made in the above are true and correct to the best of my knowledge and belief. (Nagendra M)

Related Documents